Improvement of Joint Actions in Flood Management in the Sava River Basin

Start/End: June 01, 2016 - December 31, 2018

Funded by: Western Balkan Investments Framework (WBIF) and administrated by World Bank

Main accomplishments:
  • The project component 1: preparation of the Flood Risk Management Plan in the Sava River Basin (Sava FRMP):
    • elements of Sava FRMP prepared along with the draft document for puproses of the official approval
    • public participation performed
    • database module for flood risk management developed and implementing it into SavaGIS.
  • The project component 2establishement of a joint Flood Forecasting and Warning System in the Sava River Basin (Sava FFWS):
    • operational Sava FFWS for the whole Sava River Basin
    • well trained staff in each of the Sava countries
    • recommendations on the future improvement of the system in terms of monitoring, telemetry, model development and improved implementation with prioritization of activities and estimates of the required funding.

Documents in attachment

Report on development of the draft Flood Risk Management Plan in the Sava River Basin
Report on establishment of the Sava Flood Forecasting and Warning System