Sava Preliminary Flood Risk Assessment
Prepared by the International Sava River Basin Commission in cooperation with institutions of the Parties to the Framework Agreement on the Sava River Basin (Bosnia and Herzegovina, Croatia, Serbia and Slovenia) and Montenegro.
The Preliminary Flood Risk Assessment in the Sava River Basin was accepted by the Sava Commission at its 35th Session on 1st July 2014.
Overall coordination and editing by the Secretariat of the Sava Commission.
The Preliminary Flood Risk Assessment in the Sava River Basin was accepted by the Sava Commission at its 35th Session on 1st July 2014.
Overall coordination and editing by the Secretariat of the Sava Commission.
Documents in attachment
Sava Preliminary Flood Risk Assessment Report