Technical and project reports

Sustainable Historic Environments hoListic reconstruction through Technological Enhancement and community based Resilience
Start: 1.6.2019. End: 31.5.2023. More

Water Contingency Management in the Sava River Basin - WACOM
Start: 1.7.2020. End: 31.12.2022. More

Outline of the Sediment Management Plan in the Sava River Basin
Start: 16.6.2021. End: 31.12.2021. More

Outline of the Climate Adaptation Strategy
Start: 1.6.2017. End: 31.1.2018. More

Improvement of Joint Actions in Flood Management in the Sava River Basin
Start: 21.6.2016. End: 31.10.2018. More

Establishement of the Hydrological Information System of the Sava River Basin - Sava HIS
Start: 1.7.2015. End: 31.12.2015. More

Towards the assessment of ecological status of water bodies in the Sava River Basin - STAWA
Start: 1.4.2015. End: 31.3.2016. More

Support to the International Sava River Basin Commission in the development of the Sava Geographic Information System - Sava GIS
Start: 23.1.2015. End: 30.10.2015. More

2nd phase of the U.S. Government support to the Sava countries
Start: 1.12.2014. End: 18.5.2018. More

Towards Practical Guidance for Sustainable Sediment Management using the Sava River Basin as a Showcase: Proposal of the Establishment of the Sediment Monitoring System for the Sava River Basin
Start: 1.12.2014. End: 30.10.2015. More

Towards Practical Guidance for Sustainable Sediment Management using the Sava River Basin as a Showcase: Estimation of Sediment Balance for the Sava River
Start: 19.5.2012. End: 1.12.2013. More

Water and Climate Adaptation Plan for the Sava River Basin - WATCAP
Start: 16.3.2012. End: 1.8.2015. More

Pilot project on climate change: Building the link between Flood Risk Management planning and climate change assessment in the Sava River Basin
Start: 9.3.2011. End: 31.12.2013. More

Detail Design and Prototype instalation for the River Information System on the Sava River
Start: 1.3.2011. End: 1.3.2012. More

Preparation of Implementing Documents for Establishment of the Sava GIS
Start: 29.6.2009. End: 29.12.2009. More

Feasibility Study and Project Documentation for the Rehabilitation and Development of Transport and Navigation on the Sava River Waterway
Start: 1.12.2007. End: 1.7.2008. More

Pre-Feasibility Study for Rehabilitation and Development of the Sava River Waterway
Start: 25.12.2006. End: 19.3.2007. More